The true cost of idle machines
An idle machine keeps costing you depreciation, floor space, idle power and any operator waiting at it. Price an idle hour, and learn when it costs output too.
An idle machine costs you what you pay to own it, plus the power it draws and the pay of anyone waiting at it. Depreciation, financing, floor space and insurance run by the calendar, not the spindle, so every idle hour raises the cost of each hour the machine does run. Lost output is a cost only when you had work the machine could have made.
This guide is for owners and plant managers deciding whether idle hours are worth chasing. It prices one hypothetical machining center's idle hour, then shows how to measure idle time and cut the hours that cost the most.
Key takeaways
- An idle machine still costs its depreciation, financing, floor space and insurance, because those costs run by the calendar.
- Fixed cost per running hour doubles when utilization halves, so idle hours raise the cost of every part the machine makes.
- Idle power and an operator waiting at the machine are the cash costs that an idle hour adds.
- Count lost margin only when the idle machine is a bottleneck or the plant is turning work away.
- A sensor reads idle time and downtime alike as stopped, so a reason code is what tells them apart.
Idle time is not downtime#
Definition
Idle time is scheduled time when a machine is ready to run but has no job to run. A stop during a job, including a wait for an operator, material or a program, is downtime instead, because the plant meant the machine to be making parts.
The difference decides which costs apply. A downtime hour breaks a promise the schedule made, so it costs output, recovery and often overtime. An idle hour breaks no promise, so its cost is quieter: the machine's fixed costs, carried by fewer parts.
Utilization is the share of scheduled time a machine runs, so idle time and downtime both lower it, see the utilization glossary entry. OEE treats them differently. Time with no production scheduled comes out of planned production time before availability is calculated, so a machine can post a strong OEE while it sits idle for whole shifts.
The worked example below uses these hours: two 8-hour shifts, five days a week, 50 weeks a year, for 4,000 scheduled hours. The machine runs 2,000 of them, is stopped during jobs for 800, and sits idle with no job for 1,200.
What an idle machine still costs#
An idle machine stops consuming cutting tools and coolant, and almost nothing else. NIST prices unplanned downtime from maintenance issues in US discrete manufacturing on the same logic: as the share of labor, energy and capital left idle, because "if there was less downtime, then lower levels of energy, labor, and capital would be, in general, needed to produce the same goods."[1]
Of NIST's $18.1 billion total for 2016, labor made up $12.1 billion to $13.8 billion and energy $1.1 billion to $1.3 billion.[1]
| Cost | Stops when the machine idles? | When it counts |
|---|---|---|
| Depreciation and financing | No | Keep, sell or buy decisions; shop rate |
| Floor space and insurance | No | Keep, sell or buy decisions; shop rate |
| Idle power | No, unless switched off | Every idle hour it stays on |
| Operator waiting at the machine | No | Every hour someone waits |
| Material bought ahead of the job | No | Cash tied up until the part ships |
| Lost margin | Not applicable | Only with work it could have made |
The first two rows don't grow when the machine idles. They grow per part. For example, a machine that runs half its shifts charges each running hour twice the depreciation it would charge running every shift.
The material row matters when stock arrives before the machine is free to use it. The bar stock, castings or resin sit on the floor as cash, at whatever carrying rate your finance team uses, until the part ships.
Price an idle hour#
Price an idle hour in two parts: the fixed cost it fails to absorb, and the cash it spends. Work out each machine's annual fixed cost first, because both the shop rate and the keep-or-sell decision start from it.
Fixed cost per running hour =
Definition
Fixed cost per running hour is a machine's annual ownership cost divided by the hours the machine actually runs: the share of depreciation, financing, floor space and insurance that each running hour must recover through the parts made in it.
Worked example
Idle hours on a vertical machining center, one year
- Purchase: $180,000 with tooling and installation, depreciated straight-line over 10 years, so $18,000 a year.
- Financing: 8% on the $90,000 average book value, so $7,200 a year.
- Floor space: 400 sq ft at $12 a sq ft a year, so $4,800. Insurance and the service contract: $2,000.
- Annual fixed cost: $18,000 + $7,200 + $4,800 + $2,000 = $32,000, or $8.00 per scheduled hour over 4,000 hours.
- Running 2,000 hours (50% utilization): $32,000 ÷ 2,000 = $16.00 of fixed cost per running hour. The 1,200 idle hours carry 1,200 × $8.00 = $9,600 that no part pays for directly.
- Idle power: the control, hydraulic unit, coolant pump and conveyor draw 4 kW with the spindle stopped. At the US industrial average of 9.77 cents per kWh in July 2026,[3] an idle hour costs 4 × $0.0977 = $0.39, and the 1,200 idle hours cost $468.96.
- Left on outside shifts as well: 4 kW × 4,760 hours = 19,040 kWh, or $1,860.21 a year.
- Operator waiting: private manufacturing employers paid $48.62 an hour in wages and benefits in June 2026.[2] An operator who waits at the machine for 200 of the idle hours costs 200 × $48.62 = $9,724.
Labor dwarfs power, the same pattern NIST found nationally. The power bill outside shifts is almost four times the bill for idle hours inside them, so a power-down routine at the end of the last shift saves more power than trimming idle minutes inside shifts.
The curve is steepest at low utilization. Moving from 25% to 50% takes $16.00 off every running hour, while moving from 75% to 100% takes $2.67. Chase idle hours hardest on the machines that run least, provided there is work for them.
When idle time costs you output#
An idle hour costs margin only when demand exceeds what the plant can make. If the machine has no work because there is no work, the hour costs its fixed share and its cash and nothing more.
For example, suppose the machining center is the bottleneck for a part with $22 of contribution margin after material and direct labor, and it makes 12 an hour. An idle hour then also loses 12 × $22 = $264, for $321.01 in all with an operator waiting. If your margin figure is price less material only, drop the $48.62, or you count the operator twice.
The bottleneck test matters because idle time on other machines is often correct. Writing in Modern Machine Shop, Mike Lynch puts it plainly: "A CNC machine in the cell may sit idle for long periods of time and still be appropriately utilized."[4] Making a non-bottleneck machine run more only builds inventory in front of the bottleneck.
How much idle time is normal?#
No universal figure exists. Lynch notes that shops with large lot sizes may justify more than 95% spindle run time, while others accept less than 20%.[4] The right number depends on lot sizes, how much of the cycle an operator carries, and whether the machine is the bottleneck.
National data gives context, not a target. US manufacturing used 75.7% of its capacity in August 2026, 2.5 points below its 1972–2025 average of 78.2%.[5] That figure compares output with sustainable capacity across whole industries, so it won't match a single machine's run time.
For a CNC machining center, IoTFlows' CNC setup guide expects 40 to 85% uptime depending on how much of the cycle an operator carries. Set each machine's goal from its own baseline plus 5 to 10%, not from a published range, see utilization goals.
Measure idle time apart from downtime#
A running-or-stopped signal can't tell idle from downtime: both are a stopped machine. The reason code on the stop is what splits them, so the measurement is half sensor and half operator.
Define your shifts
Idle time exists only against a schedule. Enter the hours each machine is meant to be available, including any shift that crosses midnight, see shifts and time zone.
Record running and stopped automatically
Use a sensor or a controller signal, not a paper log. A hand log rounds a 7-minute wait to zero and a 50-minute gap to an hour, and manual data collection misses short stops the same way.
Add reason codes for idle time
Create
No job scheduledandWaiting for next jobbeside your downtime reasons. Mark a code as planned only when the schedule left the machine open on purpose, see planned downtime.Have operators classify at the machine
The operator knows whether the machine is waiting for a job or for a forklift. A reason entered at the machine, in the moment, beats one reconstructed at the end of the week.
Alert on stops that run long
Set a Machine Down alert at a warning time above your normal changeover and a critical time well past it, for example 15 and 45 minutes, see machine status alerts. The alert is a duration rule: it tells a lead that a machine has been stopped too long, so someone loads the next job.
Read a full quarter by machine and shift
Filter the utilization report by shift to read scheduled hours only, see report filters. Then rank the idle and downtime reasons by hours on a downtime Pareto.
Cut the idle hours that cost the most#
Start with the machines where an idle hour costs the most: the bottleneck first, then the machines with the lowest utilization and the highest fixed cost. The reason codes tell you which fix applies.
| Why there is no job | First fix |
|---|---|
| Not enough orders for its work | Quote work that fits it |
| Work routed to a favorite machine | Route by measured capacity, not habit |
| Gap between two jobs | Release the next job before this ends |
| Next job not ready | Stage material, prove programs offline |
| Kept as backup capacity | Keep it, and count its cost as insurance |
Three decisions follow from the numbers:
- Power down outside shifts when the machine doesn't need a warm-up to hold tolerance. In the example, that is $1,860.21 a year from one machine.
- Sell or consolidate a machine that sits idle most of a year and covers no bottleneck. Its fixed cost is the saving, $32,000 a year in the example.
- Measure before you buy. A request for another machine is a request for hours. Check whether the machines you own have idle hours that a better schedule could fill.
Track idle hours automatically#
A SenseAi sensor mounts magnetically on each machine and reads its vibration and sound from the outside, with no PLC connection. It decides running or stopped every second, so every stop shows up without anyone writing it down. Operators put a reason on a stop in a tap, which is what splits idle time from downtime.
The Advanced Report totals utilization by machine and shift over any period, and the Production Scheduler plans on the same machines the sensors monitor, so the schedule uses the real part count.
Storm Power Components runs CNC machines, lasers and presses in Decatur, Tennessee. It doubled machine utilization and now schedules on real utilization data, see Storm Power's story. See how it works on machine utilization tracking.
Questions#
Should I switch machines off when they sit idle?#
Switch off what you can between shifts and over weekends, because on a two-shift machine those hours outnumber the idle hours inside shifts. Inside a shift, a short idle spell rarely justifies a shutdown when the machine needs a warm-up to hold tolerance. Ask the builder which subsystems, such as coolant pumps and chip conveyors, can stop on their own.
How should idle time change my shop rate?#
Spread a machine's fixed costs over the hours you expect it to run, not over the hours it is scheduled. A rate built on 90% utilization for a machine that runs 50% of its shifts recovers a little over half of the fixed cost, and every quoted job carries the gap.
Does idle time lower OEE?#
Only partly. Time with no production scheduled comes out of planned production time before availability is calculated, so a machine with no orders for half its shifts can still show a high OEE. Waiting for material or an operator during a scheduled job does count against availability.
Should I sell a machine that sits idle most of the year?#
Compare what it costs to own each year with what it does for you when it runs. A machine that covers the bottleneck during breakdowns, takes rush jobs or protects a customer's delivery dates can justify its fixed cost while idle. If it does none of those, selling it frees the capital and the floor space.
Written by
Ulises Carrasco, Co-founder and COO
Sources#
- Economics of Manufacturing Machinery Maintenance: A Survey and Analysis of U.S. Costs and Benefits (NIST AMS 100-34), National Institute of Standards and Technology. Accessed Oct 16, 2026
nvlpubs.nist.gov/nistpubs/ams/NIST.AMS.100-34.pdf - Employer Costs for Employee Compensation, Table 4: Private industry workers by occupational and industry group, June 2026, U.S. Bureau of Labor Statistics. Accessed Oct 16, 2026
bls.gov/news.release/ecec.t04.htm - Electric Power Monthly, Table 5.6.A: Average price of electricity to ultimate customers by end-use sector, U.S. Energy Information Administration. Accessed Oct 16, 2026
eia.gov/electricity/monthly/epm_table_grapher.php - Judging Acceptable Spindle Run Time, Modern Machine Shop. Accessed Oct 16, 2026
mmsonline.com/columns/judging-acceptable-spindle-run-time - Industrial Production and Capacity Utilization, G.17 (release of September 18, 2026), Federal Reserve System. Accessed Oct 16, 2026
federalreserve.gov/releases/g17/current/default.htm