How to choose a maintenance strategy for each machine

Match each machine to reactive, preventive, usage-based, condition-based or predictive maintenance with a four-question test, survey data and worked examples.

Reliability Engineering Team, IoTFlows

10 min read

Updated

The maintenance strategy that fits a machine depends on how its parts fail and what a failure costs. Run cheap, non-critical items to failure, and service parts that wear with use on run hours, strokes or parts made. Keep calendar PM for work owed by date, and watch critical machines whose failures come at random for a measured change.

Most plants need all five strategies at once, one per failure mode. This guide gives a four-question test for choosing, the survey numbers behind each approach, and a sample plan for CNC mills, presses and molds.

Key takeaways

  • Choose a maintenance trigger for each failure mode, not one strategy for the whole plant.
  • Run cheap, non-critical or redundant items to failure on purpose, with the spare already on the shelf.
  • Service parts that wear with use on run hours, strokes, shots or parts made, because calendar intervals drift when run hours vary.
  • Watch critical machines whose failures come at random for a measured change, and open the work when a limit is crossed.
  • In a NIST survey, the most reactive quarter of plants had 13.0% downtime against 4.0% for the least reactive quarter.

The five maintenance strategies#

Each strategy answers one question: what starts the work?

StrategyWhat starts the workPlant example
ReactiveA failureReplace a fan motor when it stops
Time-based preventiveA date on the calendarQuarterly gearbox inspection
Usage-basedRun hours, cycles or parts madeGrease a spindle every 500 run hours
Condition-basedA measured limit is crossedPump vibration passes its alarm level
PredictiveA trend projected toward failureBearing swap planned from a rising trend

Definition

Preventive maintenance (PM) is maintenance done at fixed intervals of calendar time, operating hours or cycles to lower the chance of failure, whatever condition the equipment is in when the interval comes due.

A calendar PM is a recurrence rule on a work order: a quarterly gearbox inspection comes back every 13 weeks. Usage-based maintenance is the preventive variant that counts use instead of days: hours run, strokes, shots or parts made.

Definition

Condition-based maintenance (CBM) is maintenance triggered when a measured indicator of equipment condition, such as vibration, temperature or oil quality, crosses a set limit, so work happens only when the machine shows it needs it.

Definition

Predictive maintenance (PdM) is condition-based maintenance with a forecast: measurements are trended over time to estimate when a component will reach its limit, so the repair can be planned before the failure and around production.

References draw these lines differently. The US Department of Energy’s guide counts a schedule based on machine run time as preventive, and NASA’s reliability guide treats predictive maintenance and condition monitoring as two names for one practice.[2][3] This article separates them by trigger, because the trigger is what you set up.

How failures behave decides the trigger#

A calendar or hour interval works only when a part fails at a predictable age. Many parts don’t. NASA’s guide cites three studies, of United Airlines aircraft in 1968, Swedish equipment in 1973 and US Navy equipment in 1982, in which random failures made up 77% to 92% of all failures and age-related failures the remaining 8% to 23%.[3]

Those studies covered aircraft and naval equipment, not your plant, so treat the split as a warning rather than a measurement of your machines. The pattern behind it transfers. NASA notes that simple, single-piece items such as tires, brake pads and compressor blades wear in step with age or stress cycles, while most complex items show no marked wear-out age.[3]

On a plant floor, that sorts components into two groups:

  • Parts that wear with use: cutting tools, die punches, mold vents and ejector pins, slide knives, belts, filters and grease. A count of use predicts their end well, so a usage-based interval fits.
  • Complex assemblies that fail at random: spindle bearings, gearboxes, main drive motors and hydraulic pumps. A fixed interval is early for some units and late for others, so measure their condition instead.

Opening a complex machine on a schedule carries its own risk. NASA reports that scheduled overhaul can raise the overall failure rate by adding early-life failures to an otherwise stable system.[3] A spindle rebuilt every two years because the calendar said so can fail sooner than the one left alone.

What the survey data says#

NIST’s Machinery Maintenance Survey of US manufacturers, with 2016 figures, measures how plants split their maintenance work. On average, 45.7% of maintenance was reactive, 31.8% preventive and 17.3% predictive.[1] The share barely moved with size: plants with 1 to 19 employees and plants with 100 or more both averaged 43.8% reactive.[1]

The most reactive quarter of plants, at 81.5% reactive work, had 13.0% of planned production time as downtime. The least reactive quarter, at 14.4% reactive, had 4.0%.[1]

The most reactive quarter of surveyed plants had about 3.3 times the downtime share of the least reactive quarter.

Read three caveats into those numbers:

  • It’s an association. NIST notes that the groups are small and many differences aren’t statistically significant. Downtime due to maintenance issues, 6.7% against 0.9% of planned time, is one of two gaps that were, at the 10% level.[1]
  • Less reactive plants spent more. Maintenance cost was 3.0% of shipments in the least reactive quarter against 1.9% in the most reactive.[1] Planned work costs money up front, and it buys back running time.
  • Predictive adds less than its headlines. Among plants under 50% reactive, the top half in predictive work had 15% less downtime than the bottom half.[1] That gain is real, and it’s far smaller than the gap between reactive and planned work.

The DOE guide sizes the steps the same way. It estimates that a preventive program saves 12% to 18% in cost over a reactive one, and that a well-run predictive program saves a further 8% to 12% over preventive alone.[2]

Match each strategy to the machine#

Run every failure mode on a machine through four questions, in order. The first yes sets the trigger.

Four questions per failure mode, asked in order. The first yes picks the maintenance trigger.

The DOE guide gives the same sorting as a table, adapted from NASA.[2]

ReactivePreventivePredictive
EquipmentSmall parts, non-critical itemsSubject to wear, consumablesCritical equipment
Failure patternUnlikely to failKnown failure patternRandom failure pattern
Also fitsRedundant systemsThe maker’s recommendationFailures that PM itself can cause
Adapted from Table 5.5.1 of the DOE O&M Best Practices Guide, Release 3.0. Preventive here includes usage-based intervals.

Choose reactive when a failure is cheap, safe and quick to fix, the machine isn’t a bottleneck, and the spare is in stock. NASA’s examples are non-critical motors under 7.5 HP, comfort cooling and restroom exhaust fans.[3]

Choose time-based preventive when the work is owed by date whatever the machine did: an inspection a regulation, insurer or warranty sets on the calendar. Building a PM schedule that holds covers the calendar side.

Choose usage-based when a part wears with use and the machine’s hours change from week to week.

Choose condition-based when a failure is costly, comes at no predictable age and gives a measurable warning first.

Choose predictive only when that warning trend is steady enough to plan parts and labor around. You don’t need a forecast on a machine with slack capacity or a standby unit: a limit and a work order cover it.

Here is a sample plan for a plant with mills, a press and molding machines. Replace the intervals with the maker’s or your own history:

Machine and partStrategyTrigger
CNC mill spindle bearingsCondition-basedVibration leaves its baseline
CNC way lube and spindle greaseUsage-basedEvery 500 spindle run hours
Progressive die on a 350-ton pressUsage-basedStrokes since last sharpening
Injection mold vents and ejectorsUsage-basedShots since last service
Overhead craneTime-based preventiveThe inspection date on file
Chip conveyor motor, spare in stockReactiveThe motor stops

The reactive and condition-based rows come from pricing the failure, not from the part’s name. The same arithmetic sorts any pair of failure modes.

Worked example

Run to failure or watch it? Two failure modes, priced

Sample numbers on two hypothetical machines, counting lost production only:

  • Chip conveyor motor on a Haas VF-2 with slack capacity: it fails about once every 2 years, a swap from the shelf takes 1.5 hours, and an hour of the mill’s downtime costs $150. Each failure costs 1.5 × $150 = $225, or $112.50 a year.
  • Spindle bearings on the bottleneck 5-axis mill: an unplanned failure stops it for 40 hours while the spindle is rebuilt, and an hour of its downtime costs $600. Each failure costs 40 × $600 = $24,000. Caught early, the same rebuild fits a planned weekend stop and costs no production.

Monitoring the conveyor motor pays only if it costs less than $112.50 a year. Monitoring the spindle pays if it costs less than $24,000 for each failure it catches.

Conveyor motor: $112.50 a year at risk, run it to failure. Spindle: $24,000 a failure at risk, watch it.

Usage-based or calendar PM?#

Choose a usage interval when a part wears only while the machine runs and the machine’s hours change from week to week. Keep the calendar for work that ages whether or not the machine runs, and for any inspection owed on a date, such as the overhead crane in the plan above.

A calendar interval assumes a run rate. For example, greasing every four weeks on a 500-hour interval assumes 125 run hours a week. In a slow month of 320 hours, the grease goes in 180 hours early.

In a busy month of 640 hours, it goes in 140 hours late. A meter on run hours or parts calls for the work at 500 hours every time.

Part counts work the same way. Altium Packaging’s Memphis plant inspects the Slide Knife on a bottling line every 100,000 bottles, because a date-based schedule was always either early or overdue. See the Altium Packaging story.

Usage-based maintenance covers which unit to count, how to set the first interval and how early to warn.

Condition-based or predictive?#

Both start from a measurement against a baseline: what this machine looks like healthy. Condition-based work fires when a reading crosses a limit. Predictive work trends the readings and estimates when the limit will be reached, so the repair lands in a planned stop.

The measurement can come from a route or from a sensor that stays on the machine. On a route, the interval matters. NASA advises cutting the monitoring interval to between a third and a quarter of the previous one once a reading passes its alert limit, so a quarterly vibration route becomes one every three to four weeks.[3] A sensor that reports continuously removes the interval question, and leaves the limit as the setting that matters.

How much warning you get depends on the failure mode and on how often you measure. A bearing that wears slowly shows a rising trend you can plan around. A CNC tool crash gives no trend at all: it’s a single shock, and the useful response is a work order the moment it happens.

You don’t need a remaining-life forecast to get most of the value. A limit, a baseline and a work order that opens on its own cover most machines. NASA notes that predictive testing doesn’t suit every type of equipment or failure mode, and shouldn’t be the only maintenance a site practices.[3]

Trigger work orders from the machine#

IoTFlows Maintain opens maintenance work from the same machine data that runs your monitoring. A meter counts runtime hours or parts toward a trigger point. It can email the maintenance team at 85% and open the work order at 100%.

For condition-based work, a machine event rule opens a work order when a health, shock or temperature event fires. Health alerts fire as the vibration health score falls past 60, 40 and 20.

Calendar PM is a recurrence rule on a work order. An operator who classifies a stop can open a work order from the same Classify Downtime panel, which is how RNPSA halved its maintenance response time. See predictive maintenance in IoTFlows.

Build a mixed maintenance plan#

  1. Rank machines by what a failure costs

    Price an hour of downtime on each machine, using the method in how to calculate the cost of downtime. Bottlenecks and machines with no standby go to the top.

  2. List the failure modes on the top machines

    For each of your top ten machines, write down the ways it has failed and the ways the maker warns it can fail. Your stop history ranked by hours, as in a downtime Pareto, shows which ones cost the most.

  3. Run each failure mode through the four questions

    Owed by date, cheap to fix, wears with use, measurable warning. The first yes sets the trigger.

  4. Set up each trigger

    Write a recurrence for calendar work, a meter for usage-based work and a limit for condition-based work in your CMMS. For each reactive item, stock the spare.

  5. Review the plan every quarter

    Read the work orders each trigger produced. Move a calendar task to a meter when its findings track run hours, and drop a task that keeps finding nothing.

Questions#

Is predictive maintenance the same as condition-based maintenance?#

Many references treat them as one practice, and NASA’s reliability guide uses predictive maintenance and condition monitoring as two names for it. A useful split for planning is the trigger. Condition-based work starts when a measurement crosses a limit. Predictive work starts from a trend projected forward to estimate when the limit will be crossed, so the repair can be scheduled around production.

What share of maintenance work should be reactive?#

The US Department of Energy’s operations and maintenance guide describes top-performing facilities as under 10% reactive, 25% to 35% preventive and 45% to 55% predictive. Treat that as a direction, not a target to hit next quarter. NIST’s survey of US manufacturers found an average of 45.7% reactive, so most plants have a long way to go and should start with their critical machines.

Can preventive maintenance cause failures?#

Yes. Every time a technician opens a stable machine to replace a part that was working, the new part and the reassembly can fail early. NASA’s reliability guide notes that scheduled overhauls can raise the failure rate of complex equipment this way. Replace on a schedule only parts that wear out with age or use, and inspect or monitor the rest.

Should every machine get condition monitoring?#

No. Monitoring pays where a failure is expensive, comes without a predictable age and gives a measurable warning first: spindles, gearboxes, main drive motors and pumps on bottleneck machines. A small motor with a spare on the shelf, on a machine with slack capacity, costs less to run to failure than to monitor. Rank machines by what an hour of downtime costs before you choose.

Written by

Reliability Engineering Team, IoTFlows

Sources#

  1. Economics of Manufacturing Machinery Maintenance: A Survey and Analysis of U.S. Costs and Benefits (NIST AMS 100-34), National Institute of Standards and Technology. Accessed Oct 16, 2026
    nvlpubs.nist.gov/nistpubs/ams/NIST.AMS.100-34.pdf
  2. Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0 (PNNL-19634), Pacific Northwest National Laboratory for the US Department of Energy. Accessed Oct 16, 2026
    osti.gov/servlets/purl/1034595
  3. Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment, National Aeronautics and Space Administration. Accessed Oct 16, 2026
    nasa.gov/wp-content/uploads/2023/06/nasa-rcmguide.pdf