Create parts and operations

The parts your machines run, and the operations that make them.

Every production number in IoTFlows traces back to this page. A count, a shift goal, a pace, a scheduled job and a material transaction all belong to an operation, and an operation belongs to a part. Nothing counts until both exist.

Before you start

This page is the field-by-field reference for the Parts List. If you have never set one up, run Quickstart: count your first parts first and come back here for the fields it skipped.

The parts model

A part is a thing your plant makes, named the way your traveler and your purchase orders name it. A part counts nothing by itself. It is a folder with a picture and some drawings in it.

An operation is one thing a machine does to that part, for example a roughing pass, a press stroke or a deburr. The operation is where the work happens. It carries the detection algorithm, the rule that turns the sensor's signal into cycles, the ideal cycle time, how long one good cycle takes, and the units the count is reported in.

Three relationships hold everywhere in the product:

  • A part holds as many operations as you like. An operation belongs to exactly one part.
  • An operation runs on one or more machines. You assign it from the machine, not from here. See Detect operations automatically.
  • A scheduled task is one operation on one machine. That is why parts and operations are a hard prerequisite for the scheduler. See Plan jobs on the scheduler board.

Create one operation per thing the machine does differently, not one per line on the router. If two router steps run at the same rate on the same machine, one operation counts both correctly and halves your setup. Split them only when the cycle time, the algorithm or the machine differs.

You do not need a part to know whether a machine is running. Machine state, uptime, downtime and utilization come from the sensor alone and appear on the Assets page with no part on file. See Monitor your fleet on the Assets page.

The Parts List at /production?select=parts_list, showing the Sort by and Add Part toolbar, the search box, and four part cards: GB-6610 Gear Blank, PL-3080 Cover Plate, BH-4021 and MS-7420 Manifold. Each card carries the part picture, the part name in sky blue and a paperclip, over a table of its operations with the columns OP, Operation(s), OP UNIT, Description, QTY/OP, Algorithm and Ideal Operation Cycle TimeThe parts list. Each part carries the operations that make it.

Create a part

  1. Open Production, then the Parts List tab, at /production?select=parts_list.
  2. Click Add Part. A part called New Part appears at the top of the list and the dashboard confirms with Part has been added. There is no dialog.
  3. Click the part's name, type the number your plant already uses, for example BH-4021, and press Enter.

Clearing the name and clicking away puts the old name back rather than saving an empty one.

On a phone, Add Part opens a sheet with a single Part Name field, and submitting it empty returns Please enter a part name. The desktop button never asks, so it cannot produce that message.

Part fields

FieldRequiredAcceptsUsed by
Part nameYesFree text, edited in place on the part headerThe Parts List, Shift Production, Historical, the scheduler and every job that runs one of its operations
Part pictureNoOne image, cropped and zoomed in the dashboard. JPEG, PNG, WebP and HEIC all uploadThe thumbnail beside the part on Shift Production, on scheduler cards and in the Work Queue
FilesNoAny number of files of any type, up to the browser's upload limitThe work order, so the operator running the job can open them

A production part has no number field, no description and no unit of its own. The part name is the number, which is why it is worth typing the plant's real one: a part called Bracket v2 matches no paperwork anybody on the floor is holding.

The header strip of a part card on the Parts List with three numbered violet callouts: 1 on the Add Part button in the toolbar above, 2 on the round part picture control at the left of the header, 3 on the open part name input holding BH-4021Creating a part. The name is the only thing a part needs.

Add pictures and files

The picture is the circle at the left of the part header. Click it, choose an image, drag and zoom it inside the crop frame, and confirm. It replaces whatever was there.

Files sit behind the paperclip beside the part name, which carries a badge with the number attached.

  1. Click the paperclip. Files opens, headed with the part name.
  2. Click Click or drag files to upload, or drop files anywhere in the panel. Several at once is fine, and each one shows its own progress row.
  3. Hover a file for Download and Delete. Delete asks once, in the row itself, with Cancel and Delete.
  4. With two or more files attached, the download arrow in the panel header takes all of them at once.

Click a file to preview it in place rather than downloading it. PDF, plain text, JSON, XML, CSV and Markdown, images, audio and video, and .step and .stp CAD models through the built-in viewer all preview. Anything else downloads.

Attach the drawing here rather than emailing it. Part files ride along to the work order, so the operator opens the print from the job they are running instead of hunting for it. That is the whole reason the field exists.

The Files panel headed Files over the part name BH-4021, with a download-all arrow at its top right, listing three attachments: BH-4021.step at 840 KB, BH-4021-REV-C.pdf at 1 MB, each with a colored file icon, and setup-photo.jpg at 249 KB showing a thumbnail of the photo, above a dashed Click or drag files to upload zone and the line 3 files attachedPictures and files on a part. The operator sees these from the job.

Add an operation

  1. Click + Add operation at the foot of the part's table.
  2. Type the operation name, for example OP10, and press Enter. The dashboard confirms with Operation has been added.
  3. Fill in the rest of the row cell by cell.

Every cell on the row saves when you leave it, by pressing Enter or Tab or by clicking elsewhere. There is no Save button and no draft state, so a half-filled operation is already live.

A new operation arrives with a name and nothing else. Until it has an algorithm it counts nothing, and it does not appear in the assignment list on the machine.

Operation fields

FieldRequiredAcceptsEffect on counting
OPNoUp to four digits, nothing elseNone. It orders the routing. See Operation sequence
Operation(s)YesFree text, set when you create the row and editable afterNone
OP UNITNoFree text up to 12 characters. Defaults to opsNone. It labels the count wherever the operation is shown
DescriptionNoFree text, for example Rough millNone
QTY/OPNoA number, fractions allowed, with its own unit label beside it. The label defaults to madeMultiplies every detected cycle. See Unit and quantity per cycle
AlgorithmYes, to count anythingOne of the four the server offersDecides what counts as one cycle. See Choose a production tracking algorithm
Downtime FilterNo0 to 200%. The column appears only when the part has at least one Continuous Analysis operation, and the field is editable only on that operation's rowConverts stops shorter than that share of the cycle time into running time. See Set cycle times and downtime filters
Ideal Operation Cycle TimeYes, for goals and paceHours, minutes, seconds and hundredths, plus a tolerance percentage on the two Discrete algorithmsContinuous Analysis divides running time by it to produce the count. The other three read it for goals only. See Set cycle times and downtime filters
Requires and CreatesNoInventory itemsNone. They move stock when the work order closes. See Link required and created parts to an operation

Changing the algorithm on an operation that other machines already run can come back with a Confirm Algorithm Change dialog listing those machines. Confirming removes the operation from them. See Switch to a different algorithm.

One operation row on the Parts List, OP10 Rough Mill, under the column header row OP, Operation(s), OP UNIT, Description, QTY/OP and Algorithm. Four numbered violet callouts sit beside the fields they name: 1 against the round step marker reading 10, 2 against the OP UNIT cell reading ops, 3 against the QTY/OP cell reading 1 made, and 4 against the Algorithm cell's Discrete Analysis pill. The Description cell reads Rough mill both facesAn operation's fields. Quantity per cycle is the field behind most doubled counts.

Operation sequence

The sequence is the step number the operation holds in the routing, shown as a circle in the OP column and joined to its neighbors by a hairline.

  1. Click the circle. On an operation with no number yet, hover the row and click the dashed +.
  2. Type the step number, for example 20. Digits only, four at most.
  3. Press Enter. The rows resort themselves and the marker rings once so you can follow the one that moved. Escape cancels.

Operations without a number sit at the end of the list, in whatever order the server sent them.

Why did OP100 land above OP20? Step numbers sort as text, not as numbers, so 100 comes before 20 the same way Ba comes before Bx. Pad the numbers to a fixed width and the problem disappears: number the routing 010, 020, 100 rather than 10, 20, 100.

The OP and Operation(s) columns of a part table, three rows deep under their column headers. Round step markers reading 10, 20 and 30 sit in a vertical line joined by a hairline, against the operation names OP10 Rough Mill, OP20 Finish and OP30 DeburrOperation sequence. Create one operation per thing the machine does differently.

Unit and quantity per cycle

Quantity per cycle is how many parts one detected cycle of this operation produces. It is the QTY/OP cell, and it multiplies the count the algorithm arrives at.

What the machine doesQTY/OPResult
One cycle makes one part1The count is the cycle count. This is the usual case
A four-cavity mold shoots four parts4100 cycles count as 400 parts
Two cycles are needed to finish one part0.5100 cycles count as 50 parts

Check this cell first when a count comes out doubled or halved. It is the only field on the row that scales the answer, so a mold changed from two cavities to four shows up here as a count that is exactly half of reality.

The operation carries two unit labels, both free text and both capped at 12 characters:

  • OP UNIT names what the operation counts, and defaults to ops. Set it to cycles, passes or strokes when that reads better on a gauge.
  • The label beside QTY/OP names what one cycle yields, and defaults to made. Set it to cut, shot or lbs.

These are labels, not conversions. Changing ops to lbs changes what the gauge on Track production against shift goals says, not what it counts. Use QTY/OP for the arithmetic.

Edit or delete

Everything on this page is edited in place. Click a cell, change it, and leave the cell.

Parts carry their actions in the ... menu at the far left of the header, which appears on hover:

  • Archive this part asks Are you sure you want to archive part BH-4021? and confirms with Part has been archived.
  • Delete this part asks Are you sure you want to permanently delete part BH-4021? and confirms with Part has been removed.

Operations carry an archive icon and a trash icon at the right of the row, also on hover, with the same two confirmations and the toasts Operation has been archived and Operation has been deleted.

Archive rather than delete once an operation has produced anything. Deleting an operation removes its historical association: the production it counted stays in your data, but no longer carries the operation's name, so the run disappears from anything that groups by operation.

Archived parts leave the Parts List. There is no view of archived parts and no restore control in the dashboard, so treat archiving as a one-way move and contact IoTFlows if you need one back. See Contact support and report bugs.

The search box above the list matches part names and operation names together, so typing GB-66 finds the part and typing DEBURR finds the part that has that operation.

Typing writes the text into the address bar as ?q=, which means a filtered list is a link. Send /production?select=parts_list&q=BH-4021 to someone and they open the same view. No match returns No matches found for BH-4021.

Sort by, at the top left, offers four orders:

Sort optionOrder
Date: New to OldMost recently created part first. The default
Date: Old to NewOldest part first
Name (A to Z)Part name ascending
Name (Z to A)Part name descending

On a phone the same four are in the toolbar's view menu, labeled Newest, Oldest, Name A-Z and Name Z-A.

The top of the Parts List with BH typed into the search box and the Sort by control above it reading Date: New to Old. The list below is narrowed to the single part BH-4021, whose paperclip carries a badge reading 3, over its one operation row OP10Searching the parts list.